Saltar al contenido

Installation Hardware

Ultimate Horizontal Starter Track

  • Ensures a fast, level installation
  • Patented drainage channel directs water out and away from the base of the wall
  • Lead time: 5 days

Specifications

Length (ft.)
10
Packaging (pieces per pack)
10

*This accessory is designed for use in the prescribed manner with designated Nichiha products only. Use with other products or in other manners is not warranted.

Póngase en contacto

Permita que uno de nuestros expertos en productos lo llame.

Este campo es para fines de validación y debe dejarse sin cambios.
Nombre(Obligatorio)
Ubicación del proyecto(Obligatorio)