Passer au contenu

Essential Flashing

Compression Joint Flashing

Used in conjunction with Ultimate Horizontal/Vertical Starter Tracks at floor joists in buildings that require compression joints

Available Finishes

  • Primed 5 days
  • Clear Anodized 5 days
  • Powder Coated 5 days to 4 weeks
  • Custom Color 8-10 weeks

Specifications

Length (ft.)
10
Weight (lbs. per piece)
1.8
Packaging (ln. ft. per tube)
50

*This accessory is designed for use in the prescribed manner with designated Nichiha products only. Use with other products or in other manners is not warranted.

Contacter

Laissez l'un de nos experts en produits vous appeler.

Ce champ est réservé à la validation et ne doit pas être modifié.
Nom (obligatoire)
Emplacement du projet (obligatoire)