Saltar al contenido

Essential Flashing

Compression Joint Flashing

Used in conjunction with Ultimate Horizontal/Vertical Starter Tracks at floor joists in buildings that require compression joints

Available Finishes

  • Primed 5 days
  • Clear Anodized 5 days
  • Powder Coated 5 days to 4 weeks
  • Custom Color 8-10 weeks

Specifications

Length (ft.)
10
Weight (lbs. per piece)
1.8
Packaging (ln. ft. per tube)
50

*This accessory is designed for use in the prescribed manner with designated Nichiha products only. Use with other products or in other manners is not warranted.

Póngase en contacto

Permita que uno de nuestros expertos en productos lo llame.

Este campo es para fines de validación y debe dejarse sin cambios.
Nombre(Obligatorio)
Ubicación del proyecto(Obligatorio)